The paper investigates overvoltage propagation in a 400 kV network within the National Grid Electricity Transmission system in the UK. The studies were triggered by a replacement project for two parallel 400 kV cables and the installation of an additional one. The network in the vicinity of the cables has historical issues of flashover and circuit breaker failures. Electromagnetic transient studies were performed to simulate energisation and fault inception and clearance for the three new cables to examine compliance against overvoltage standards and limits. Studies were performed using the DIgSILENT analysis tool. Studies show that due to resonance in a specific frequency range, switching overvoltage propagated and amplified at remote nodes to a level close to the equipment's rated switching voltage. As mitigation, surge arresters with characteristics different from the National Grid recommended surge arresters were proposed and found suitable to bring the overvoltage values within the design limits for temporary overvoltage.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.