Abstract

In recent year, non-conventional energy generation is coming up for effective use of natural energy, such as wind energy. Induction generators consisting squirrel-cage rotors are widly used as wind generators because of their salient features like robust rotor design, simple in the construction, maintenance free operation, etc. However these induction generators will draw large transient inrush current, several times as large as the machine rated current, the instant when they are connected to utility grid or restored after the fault clearance. Under such situations, there will be a severe voltage fluctuations in the power system. In this paper, we present transient analysis of induction generators before and after a three-phase fault conditions. Theoretical discission is developed to determine the initial phase angle and the time at which maximum transient currents flow in the system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.