Abstract

Critical path analysis on a project network having non-finish-to-start (FS) logical relationships with lags is generally referred to as precedence diagram method (PDM). A PDM-based scheduling analysis is facilitated by mainstream project scheduling software (such as P3 ). However, PDM compounds total float determination and interpretation, potentially causing anomalous effects on critical path identification. In the present research, we generalize those particular circumstances that entail applying non-FS logical relationships on construction projects. We then propose generic transform schemes such that non-FS relationships in a PDM network can be detected and transformed—automatically—into equivalent FS. Moreover, we provide analytical proofs for the transform schemes being proposed to justify the logical equivalency between the original PDM network and the transformed activity-on-node (AON) network only having FS logical relationships. A PDM network example demonstrates that confusions would arise in in...

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call