Abstract

Partial discharge (PD) measurements are one the most important non destructive test methods to evaluate the integrity of the insulation system of power transformers. PD measurements on site are strongly influenced by noise and besides the level of the PD activity the location of the PD source is of importance. Using the well known transfer function from transformer impulse tests the variation of the PD signal travelling trough the transformer winding are the basis for the separation between noise and PD signals and also for the localization of the PD source. Laboratory tests show very good results. With a simple capacitive coupler and signal transmission via fibre optic cable the system can also be used satisfactorily on site.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.