Abstract
In this paper, an analytical framework for studying the transfer delay of wireless application protocol (WAP) 2.0 for short-lived flows is developed based on a two-state Markov chain that approximates both correlated and independent packet losses. For a given wireless link and protocol parameters, an explicit mathematical expression which yields a good estimate of the WAP 2.0 transfer delay is derived. The analytical results are validated by simulation. It is shown that for large file sizes (> 30 kB), WAP 2.0 is more sensitive to bursty packet losses than random packet losses. It is also shown that the transfer delay of WAP 2.0 can be improved by increasing the size of the initial window in a low-rate bursty error environment but degrades in a high-rate bursty error environment
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.