Abstract

THE purpose of this paper is to outline procedures and discuss pertinent problems that arise when restoring service to a metropolitan system following a major shutdown. In the discussion, consideration is given to the fundamental plan of the system, pointing out the inherent features in the design which prevent such failures. Several cases of trouble which have been the cause of service curtailment have been discussed and the service restoration procedure outlined. A brief outline of the essential procedure is given for two types of service restoration.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.