Abstract

Efficiency can be improved through the cooperation of a dual-robot during assembly. However, how to effectively plan a simple and smooth path in a dynamic environment is a prominent problem in the process of dual-robot cooperative assembly. In this paper, a method based on RRT-Connect algorithm for trajectory planning and post-processing for trajectory optimization is proposed. This method takes full advantage of the excellent solution ability of RRT-Connect algorithm in the complex environment so as to obtain the initial path successfully. Through post-processing, the problem of RRT-Connect non-convergence to target is optimized. We use two 6-DOF industrial robots to build an experimental platform and design a dual-robot cooperative assembly system. According to the given task, the system can generate the original collision-free path based on RRT-Connect algorithm. Then the original path is simplified by Floyd algorithm and smoothed by multi-segment Bezier curve. Finally, the time parameter is sequenced for all the path points based on the iterative method, and the effective trajectory is obtained. The experimental results show that the algorithm proposed in this paper can effectively plan and optimize the trajectory of dual-robot. Compared to other methods, this approach has a higher success rate and less planning time.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.