Abstract

We consider the problem of planning the shunting of train units at a railway workshop area. Before and after the maintenance check, a train unit is parked at a depository track. The problem is to schedule the trains to workshops and depot tracks in order to complete the repairs as soon as possible, while avoiding train blockings at the tracks. We give a formal definition of the problem and present three heuristic approaches based on, respectively, Guided Local Search (GLS), Guided Fast Local Search (GFLS) and Simulated Annealing (SA). Computational experiments are reported for realistic instances. It turns out, that both GLS and SA find within a few minutes solutions that are a few percent from the best MIP solution found.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.