Abstract
With the increasing number of vehicles in Yantai, the downtown traffic volume is increasing. Hongqi Road, the main road in Yantai exists the traffic congestion problems. Yantai Planning Bureau proposed to construct for viaduct this road. This design is mainly based on the planning and design of the elevated road in Yantai Hongqi Road (Hongqi Road intersection-Shanhai Road intersection). We used the VISSIM micro simulation system to carry out the simulation of the elevated road in Hongqi Road, and the stops and queue length are the evaluation indices for quantitative evaluation. Then through the evaluation indices and specific data obtained by simulation, we analyze the selection of the scheme and draw the final plan of the construction of the elevated road, which was provide a good reference for the planning and construction of Hongqi elevated road.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.