Abstract

Abstract: Package CS3 of Metro Line 1 in Surat City includes 3 stations i.e. Surat railway station, Maskati Hospital and Chowk Bazar. As per proposed Metro plan of Surat city, this line will originate from Sarthana station and will terminate at Dream City. The length of Line 1 is 21.61KM of which 14.59km is elevated whereas 7.02km is Underground and consists of 20 Stations. This metro line envisages use of public transport system in Surat city and shall cater the present and future travel demand of the catchment area and shall also reduce load from road based transport system of the corridor. During the construction phase of any Mass Rapid Transit System (MRTS) running along the Right of Way (ROW) of existing roadway system, Traffic diversion and management plan implementation becomes absolute mandatory to reduce congestion, conflicts increase level of safety and ease construction process. Similarly, for package CS3 of Surat Metro line 1, there is need of preparing an implementing Traffic Diversion and Management plan to create a synergy amongst construction activities, traffic flow, safety of pedestrian and construction worker with minimal impact on surrounding catchment. This study shall provide Traffic diversion and management plan which may help to cater the existing traffic and stir them in a smooth and non-congested flow with the help of signage’s, road markings, etc.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.