Abstract

A heuristic solution to rescheduling railway traffic, when an already planned schedule cannot be adhered to because of disruptions is presented in this paper. A mixed integer programming (MIP) formulation is developed to model disruptions that lead to conflicts on a single track bi-directional scheduled traffic with over-taking and follow-up capacities. The proposed objective is to minimise the total delay of all trains in the operational domain at their respective destinations. We have developed a rescheduling heuristic that re-sequences the conflict trains using a look-ahead-based dynamic ranking (LADR) approach. LADR procedure ranks the conflict trains on their static priority, myopic delay, critical ratio, number of future conflicts and total future delay. The heuristic procedure takes as input a conflict free schedule and is action-initiated by any disrupt to this schedule. The conflicting trains are identified and on the basis of their sorted LADRs departure times are assigned. Each conflicting train is rescheduled one at a time till all trains are rescheduled to their destinations. Our results are promising when evaluated against three other known procedures on a medium-sized real world data.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.