Abstract

The torrential hydrographic network poses peculiar problems in terms of action planning. Flash floods are formed with intake leak on the slopes of the basin takes violent forms of expression along the river network, particularly in the areas of training and floating transportation. Prevent these destructive processes on the river cannot be reached except through hydrotechnical works, especially when it comes to preventing and combating the process of warping the accumulation lakes, as is the case of the Somes Valley. For the hydrotechnical works is necessary a continuous and systematic follow-up because these, due to land and torrential special conditions in which are located, are themselves subjected to destructive processes.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call