Based on the reconstruction of an office building in Guangzhou and the actual application, the tracking management methods of prefabricated box steel structure building components are summarized and the corresponding management methods suitable for prefabricated box building are found. Through the application of building information modeling (BIM) technology, the standardization of the implementation of the scheme is made, and implementation process, component tracking management methods are further validated and improved. In this way, the prefabricated component design, production, transportation, approach, information transmission problems in installation process can be solved, and the management efficiency of prefabricated box component tracking can be improved, material waste can be reduced. Using BIM technology can effectively guarantee the progress of the project, and provides examples for similar projects.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call