Abstract

The existing Tokamak Fusion Test Reactor (TFTR) Neutral Beam system is proposed to be modified for long pulse operation on the Tokamak Physics Experiment (TPX). Day one operation of TPX will call for one TFTR beamline modified for 1000 second pulse lengths oriented co-directional to the plasma current. The system design will be capable of accommodating an additional co-directional and a single counter directional beamline. For the TPX conceptual design, every attempt was made to use existing Neutral Beam hardware, plant facilities, auxiliary systems, service infrastructure, and control systems. This paper describes the moderate modifications required to the power systems, the ion sources, and the beam impinged surfaces of the ion dumps, the calorimeters, the various beam scrapers, and the neutralizers. Also described are the minimal modifications required to the vacuum, cryogenic, and gas systems and major modification of replacing the beamline-torus duct in its entirety. Operational considerations for Neutral Beam subsystems over 1000 second pulse lengths will be explored including proposed operating scenarios for full steady state operation.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call