Abstract
Imaging systems larger than the James Webb Space Telescope will enable unprecedented astronomy in the future. Larger aperture space-based imagers will also support next-generation Earth Observation missions for national security and disaster monitoring. However, launching and operating such large telescopes in the poses several practical challenges. A key challenge is that mirrors with apertures larger than 3 m cannot be monolithically manufactured so a segmented design is utilized to achieve primary mirror apertures. Even if larger mirrors could be made, it would be impossible to stow them in fairings of most existing and future launch vehicles. Folded-wing designs to deploy segmented primary mirrors, as done with the James Webb Space Telescope, are one approach to overcoming this volumetric challenge but inappropriate for 25 m apertures considered in this study. This paper presents the concept of operations and mission architectures/analysis for on-orbit assembly of a 25 m aperture telescope operating in the visible waveband of the electromagnetic spectrum capable of 1 m spatial resolution from geostationary orbit. Further, a technology demonstration roadmap towards maturing the robotic assembly technology stack is then presented as precursors to the 25 m imaging system.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.