Abstract
Construction management, as an emergent field of research, is yet to have a recognized methodological orientation, characteristic of other more established domains, and therefore builds on the traditional philosophical assumptions of related natural and social science research. The term “Methodological pluralism,” has thus been used to describe the use of a multiplicity of philosophies and methods, compatible with the study of construction phenomena. This study narrows down the philosophical argument in construction management to within the specific domain of cost overrun research, to systematically articulate the shortcomings in the methodological/philosophical tradition embraced by previous studies. Empirical profiling of cost overrun research reveals the predominance of mono-method studies based on questionnaire survey methods, correlative analysis, and archival data modeling techniques, all of which are underlain by positivism. The study argues that such positivist philosophies, although methodologically valid, cannot adequately explain and provide an in-depth understanding of the contextual drivers in construction organizations, that trigger the more tangible technical constructs, leading to the phenomena of cost growth in projects. Joining in the chorus call for methodological pluralism in construction industry research, this study makes a case for critical realism specifically in the context of cost overrun research.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: INTERNATIONAL JOURNAL OF INNOVATION AND ECONOMIC DEVELOPMENT
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.