Abstract
LEO satellite networks, with moderate propagation delay and low terminal power requirement, are considered as a promising solution to providing global seamless access services for ubiquitous computing. In order to satisfy the requirement of accessing computing resource for users, end-to-end delays should be bounded for a continual and reliable connectivity. But given dynamic topology and non-uniform distribution of terrestrial users, end-to-end delays within LEO satellite networks are liable to fluctuate. Hence, to examine the delay constraint, an analytical model based on a tandem queue is established under a hot-spot traffic pattern, which is unfavorable for bounded delays. The departure interval moments of a target flow are calculated and fitted for the next link as input parameters, from which queuing delays under cross flows are iteratively obtained. The analytical results show that this model is able to depict the influence by the traffic pattern with satisfying accuracy, which is valuable for the design of routing schemes in satellite networks.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.