Abstract

The footbridge presented in this paper is located about 3 km from the city of Lleida, in Spain, and was built to cross an already existing roadway, a railway line and the new projected high-speed rail-way line between Madrid and Barcelona. The owners required a new pedestrian structure with minimum maintenance and which would be easy to erect. The footbridge was completed in October 2001. The proposed and accepted construction solution resulted in an innovative design using GFRP pultruded profiles which have no magnetic interaction with the electrified railway line, minimum maintenance costs and was easy to build. Thanks to its lightness, it took only 3 hours tocomplete the erection of the bridge to its final position.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.