Abstract

Nuclear power is producing electricity for the benefit of society but is also leaving radioactive residues behind. It is our responsibility to handle these residues in a safe and proper manner. The development of a system for handling spent fuel from nuclear power plants has proceeded in steps. The same is true for the actual construction of facilities and will continue to be the case for the final repository for spent fuel and other types of long-lived wastes. The primary objective in constructing the repository will be to isolate and contain the radioactive waste. In case the isolation fails for some reason the multibarrier system should retain and retard the radionuclides that might come into contact with the groundwater. A repository is now planned to be built in two steps where the first step will include deposition of about 400 canisters with spent fuel. This first step should be finished in about 20 years from now and be followed by an extensive evaluation of the results from not only this particular step but also from the development of alternative routes before deciding on how to proceed. A special facility to encapsulate the spent fuel is also required. Such an encapsulation plant is proposed to be constructed as an extension of the existing interim storage CLAB. Finding a site for the repository is a critical issue in the implementation of any repository. The siting process started a few years ago and made some progress but is by no means yet completed. It will go on at least into the early part of the next decade. When the present nuclear power plants begin to be due for retirement there should also be some facilities in place to take permanent care of the long-lived radioactive residues. Progress in siting will be a prerequisite for success in our responsibility to make progress towards a safe permanent solution of the waste issue.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call