Abstract

Analysis of technological wastewater streams in a refinery and petrochemical complex was carried out. Wastewater flowrates, temperatures, pH and pollutant contents were measured. Regarding the characteristics of the individual waters, possible connections between water outflows from the processes or process units and potential water consumers were determined. Possibilities to reduce the flowrate of technological wastewater with wastewater reuse or preliminary regeneration and reuse were found. The consumption of fresh water could be lowered by 11.2 m3/h, reducing the treatment system load and prolonging its residence time by 7%. The payback period for the changes proposed in the petrochemical plants is 6 months with annual savings of US$27 630. The payback period for the changes proposed in the refinery is 11 days with annual savings of US$15 500.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.