Abstract

This paper addresses the m-machine no-wait flowshop problem where the set-up time of a job is separated from its processing time. The performance measures considered are the total flowtime and makespan. The scheduling problem for makespan reduces to the travelling salesman problem (TSP), and the scheduling problem for total flowtime reduces to the time-dependent travelling salesman problem (TDTSP). Non-polynomial time solution methods are presented, along with a polynomial heuristic.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.