Abstract

Topology design of (3T-1R) parallel mechanism (PM) based on POC equations is discussed in detail as an example to illustrate the systematic method for topology design of PMs proposed in Chap. 9. The design process includes two stages. The first stage involves traditional structure synthesis, which results in 18 structure types of (3R-1R) PMs that contain no P pairs. The second stage includes topological performance analysis and classification of the obtained PM structure types which may help designer to select the most suitable structure type. Its core contents include: (1) Key steps of topology design for (3R-1R) PMs include: (a) Determine structure types of the SOC branch containing only R and P pairs according to the method for structure synthesis of SOC branch described in Chap.8. Then obtain corresponding HSOC branches through topologically equivalent principle in Chap.9. (b) Determine the geometrical condition for assembling branches between two platforms according to corresponding basic formulas in Chap. 9. Then determine different assembling schemes for the same geometrical condition. (c) Performance analysis and classification of the obtained PM structures are conducted based on topological characteristics of PMs in Chap. 9. The result can be used for assessment and optimization of (3R-1R) PM structure types. (2) 18 types of (3T-1R) PM structures containing no P pair are obtained, two of which have already been used in existing SCARA parallel robots. The other structure types may potentially be used in new SCARA parallel robots. (3) These 18 structure types of (3R-1R) PMs are classified into four types: Type-1 include four PMs containing only SOC branches; Type-2 include six PMs containing only HSOC branches; Type-3 include seven PMs containing both HSOC and SOC branches; Type-4 include three PMs with partial motion decoupling property. (4) According to topological performance analysis and classification of these PMs based on topological characteristics, the type-3 PM has a higher rigidity than a type-1 PM and a larger workspace than a type-2 PM. So, special attentions shall be paid to type-3 PMs.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.