Abstract
Abstract In this paper the tool allocation problem of a flexible manufacturing system is discussed. Two algorithms are developed and compared with one another in the presence of the “part move” strategy which moves the item to the workstation having the necessary tooling. The tools can not be shared between the machines. The aim is to find the appropriate cutting tool allocation which minimises the part flow between the CNC centers, i.e. the total distance travelled by the material handling system.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.