Abstract

TOC (Theory of Constraints) is well known as the management theory that pays attention to the bottleneck resource. There are many papers that discuss the about TOC. At the production management, TOC scheduling aims to use bottleneck machine effectually. Many scheduling methods are match for flow shop problems. One scheduling method has been extended in order to apply the job shop problem that the objective function is minimization the make span. However, the operations time are determined, there are some case that operations time are variable in real production situation. Therefore, in this paper, we consider a statistical change of the operation times. The method has three important steps. Firstly, the bottleneck machine is searched. Secondly, drum schedule (operation sequence on the bottleneck machine) is decided. Thirdly, other machines schedules are decided by following the drum schedule. Moreover, we show the efficiency of our proposal methods and describe about influence of many conditions by numerical experiments.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.