Abstract

ABSTRACTDeep mining activity has totally ceased in the Durham coalfield, and withdrawal of the regional dewatering scheme is being contemplated. Consequent groundwater rebound is expected to have severe and expensive environmental consequences, which could only be entirely avoided through indefinite pumping. However, continued pumping is expensive, at about $1 million/annum. The options of either abandoning or continuing pumping have differing time streams of future costs and, consequently, direct comparison of the expenditures involved is difficult. Both options are therefore analysed using economic evaluation criteria in order to determine the lowest cost alternative for the future. The overall outcome of the economic analysis, using both net present value and equivalent annual cost criteria, demonstrates that the option of continued pumping is less expensive than the option of abandoning pumping in all cases.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.