Abstract

According to design requirements, to reduce the construction difficulty for crane beam on rock wall in underground main power house of JinpingII hydropower, and to condense construction time limit for a main building, theconcreting time for crane beam on rock wall is needed to be specially analyzed. As the property of JinpingII hydropower station is under high field stress, numeric analysis uses rock mass deterioration constitutive model RDM. Considering the special mechanics behavior between concrete and rock wall, softening element and interface element are used respectively to make the simulation. By analyzing the stress for different placement times of crane beam of main house, it is shown that placement timing has certain extent effect on upper stress of crane beam. As a result, in order to assure stability of constructing and operating periods of crane beam, the calculation and analysis suggest that the concreting should be after the third excavation, but certain structural joint need to be installed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.