Abstract

Research for mechanism of concrete structure interacting with formwork support by manufacturing 2 test models of two-layer and single-span reinforced concrete frame at laboratory,and analysis interaction performance between concrete structure and formwork support and the influence of construction period,curing time of concrete and load on mechanical performance of formwork support system during the construction period.Research data shows:formwork support system interacted with concrete structure is a linear system when live load applied is smaller then crack load calculated according to mechanical indicators of loading-age concrete;load applied by formwork support system decreases with develop of curing time of concrete and removal of bottom support and construction period extension;it is also effected by environmental temperature.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.