Abstract

Accelerating the project schedule raises the total cost of the project and shall be efficient only up to a certain limit. A Time-Cost Trade-off Problem (TCTP) is utilized to detect the optimal set of time-cost alternatives to enhance the overall construction project benefit. In this study, to find a set of Pareto front solutions, a multi-objective optimization model which is based on the Teaching- Learning Based Optimization (TLBO) incorporated with the Modified Adaptive Weight Approach (MAWA), is proposed. Four examples of construction projects taken from the technical literature ranging from 7 to 63 activities are investigated to show the performance of the MAWA-TLBO. The results are compared with those obtained using previously proposed models considering the optimal or near optimal solutions. It was found that the MAWA-TLBO algorithm works effectively for the TCTP in construction engineering and management field.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.