Abstract

In the process of tunnel construction, because the rock stress redistribute, the vault and the two groups will generate displacement constantly. This paper adopts the genetic algorithm to optimize the weight and threshold of BP neural network, taking the tunnel depth, rock types and part measured values of displacement as input parameters to construct a neural network time series prediction model of tunnel surrounding rock displacement. The method proposed in the paper has been applied in the Ma Tou Tang tunnel construction successfully, and the results show that the model can predict the displacement of the surrounding rock quickly and accurately.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call