Abstract
The temporal development of clear-water local scour depth at cylindrical bridge piers in uniform sand beds is considered. New data are presented and used to quantify the influence of flow duration on the depth of local scour. An equilibrium time scale (t*) is defined. The data show that both t* and the equilibrium scour depth (dse) are subject to similar influences of flow and sediment parameters, as might be expected because they are inherently interdependent. A method is given for determination of the time for development of dse for a given pier, sediment, and approach flow velocity and the concomitant estimation of the scour depth at any stage during development of the equilibrium scour hole. The results show that the scour depth after 10% of the time to equilibrium is between about 50% and 80% of the equilibrium scour depth, depending on the approach flow velocity.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.