Abstract
In any construction contract, the use terms and conditions in construction contract clauses has a great impact on the project performance, which in turn affects the achievement of the project completion date. Clauses within a contract should fit together to form a reasonably allocated risk among project parties and relevant to the complexity of projects. The General Condition clauses, which were looked at in this study, consist of the ones that relate to the time performance of the contract as well as that deal with action required at specific points in time within a contract. As we know, a clear and more complete General Condition documentation should end up with win-win situations for parties involved. If there are much unclear and even unknown information within the General Condition, the parties contracting will encounter uncertainties with relations to time that during the project execution. For the parties contracting, it is always to their advantage if more complete and comprehensive documentation used as it means fewer disputes, less conflicts, and time and energy saving during construction instead of claiming and debating over the provisions. The paper is to present an analysis on the time related clauses and provisions in the current local (used in Malaysia) and international construction contracts.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Civil Engineering, Science and Technology
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.