Abstract
Few studies compare the efficacy of the key bariatric procedures in type 2 diabetes management over the long term. None offer a reliable comparison of their respective efficacy loss over time. To analyze and compare the time evolution of the antidiabetic effects of the key bariatric procedures. Obesity surgery departments in America, Europe, and Asia. All the randomized clinical trials assessing the efficacy of bariatric surgery in type 2 diabetes management with 1-5 years of follow-up were reviewed. A network meta-analysis with meta-regression was performed to compare the effectiveness of each technique and its respective efficacy loss temporal dynamics. Thirty-one trials involving 1906 patients were included. In comparison to Roux-en-Y gastric bypass, the 5-year complete or partial diabetes remission rates were inferior with medical treatment (odds ratio [OR] = .05; 95% credible interval [CrI]: .02-.13) and gastric banding (OR= .38; 95% CrI: .16-.87), equivalent with sleeve gastrectomy (OR = 1.08; 95% CrI: .59-1.97), and superior with 1 anastomosis gastric bypass (OR = 3.00; 95% CrI: 1.12-8.33) and biliopancreatic diversion and its affiliated techniques (OR = 3.71; 95% CrI: 1.16-12.55). However, remission rates and glycemic control progressively decreased whatever the treatment option evaluated. Moreover, this loss of efficacy followed a statistically comparable temporal dynamic to those of Roux-en-Y gastric bypass regardless of the therapeutic strategy implemented. No therapeutic modality offered stable antidiabetic effects. The gap observed between the techniques after a 5-year follow up concerning remission rates and glycemic control could depend essentially on the magnitude of the effects initially obtained. However, these results need to be confirmed over longer follow-up periods.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Surgery for obesity and related diseases : official journal of the American Society for Bariatric Surgery
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.