Abstract
This paper proposes a strategy for implementing shrinking horizon Model Predictive Control (MPC) using a limited number of optimization iterations at each timestep. Offline and online certification methods are presented for determining a time-varying bound on the number of optimization iterations that ensures the closed-loop system satisfies a specified terminal constraint. An axisymmetric spacecraft spin stabilization example is reported to demonstrate the certification procedure.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.