Abstract
Abstract Time Cost Trade-off Problems have received considerable attention in the literature on deterministic project scheduling problems but integrating the quality factor to these problems dates back to the mid-nineties with the pioneering work of Babu and Suresh (1996) . Since then, to the best of our knowledge, about twenty papers have been published on this topic. The present paper analyses these Time Cost Quality Trade-off Problems in light of the usual classification for Time Cost Trade-off Problems that is based upon the number and category of resources and on the continuous or discrete type of the relationship between duration and cost or resources utilisation. In this survey, the emphasis is on the definition of project activities quality and on aggregation methods used to derive the overall project quality. We report the absence of a direct relationship between quality and resources allocated to activities and a lack of use of the lexicographic method to solve the problem.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.