Abstract

Abstract: The ANN has received a lot of attention recently because of its ability to tackle both quantitative and qualitative challenges in the building sector. This paper proposes using the ANN to forecast the Cost Performance (CP) and Time Performance (TP) of the prefabrication process in a building project. In this case, various percentages of prefabrication contents are added to the building, and estimated duration, real duration, estimated cost, and actual cost are utilised as inputs to the ANN process. Keywords: Time and cost estimation, ANN, construction, pre-fabrication

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.