Abstract

The pipe instalation of offshore EPC project has high risk of cost overruns due to the uncertainty of weather, human errors, pipe fabriction process, etc. All of those risks will cause the project delay. The optimiziation of risk based project scheduling can reduce the risks. Risk management can be optimized with combining some methods, such as Failure Mode and Effect Analysis (FMEA), Fault Tree Analysis (FTA), Critical Path Method (CPM) and Crashing Project method. The combination of these methods are used to do the data analysis in order to reduce the project total duration. Based on analysis using FMEA, FTA, CPM and crashing project method, the total of project duration can be reduced from 499 days to 489 days with Rp. 6.822.472,- as the additional cost of workers.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.