Abstract

Linear programming is a widely used tool for timber harvest scheduling in North America. However, some potential problems related to infeasible harvest schedules, overly optimistic objective function values, and the need to strictly satisfy all constraints included in deterministic model formulations have been raised. This paper describes a fuzzy approach for explicitly recognizing the imprecise nature of the harvest flow constraints usually included in harvest scheduling models. The objective function and selected constraints are viewed as soft, and satisfactory solutions are derived and discussed for several scenarios. An illustrative sample problem is presented to demonstrate the methodology, and a comparison with solutions derived from a traditional linear programming model is presented.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.