Abstract
Recently, along with many emerging applications and services over Wireless LANs (WLANs), the demands for higher-speed WLANs have been growing drastically. However, it is well known that IEEE 802.11 Medium Access Control (MAC) has a high overhead. As a solution to improve the system efficiency, the new IEEE 802.11e MAC introduces Block ACK scheme. In this paper, we mathematically analyze both throughput and delay performances of the 802.11e Block ACK scheme over a noisy channel considering the Block ACK protection scheme. Then, the numerical results are verified with ns-2 simulations.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.