Abstract

This article describes the working principle and driving schedule of Three-phase bridge inverter, proposing a PWM Control Realization method which Duty Cycle is adjustable and the delay time of the switch tube on and off can be preset. The generator uses CPLD for hardware foundation, and based on VHDL hardware description language for the simulation test in Max+Plus□.The PWM controller which uses CPLD greatly simplifies the control system's hardware and software design,suitable for three-phase circuit with different topology structure, with in-system programmable, easy transplantation,strong controllability other significant advantages.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.