Abstract

This paper presents a new fuzzy chance-constrained programming model to find the solution for multiproject and multi-item investment combination in investment combination problems. The proposed 0–1 integer programming model has three objectives with fuzzy constraints, and NSGA-II is applied to solve the optimization model with a small modification of the constraint-handling rule. A simulation experiment illustrating the application of the proposed model is presented and Pareto-optimal solutions are obtained through a modified NSGA-II algorithm. A comparison among NSGA-II, PSO, and DE shows that modified NSGA-II has some advantages over PSO and DE.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.