Abstract

In longwall coal mining, significant deformation of small-pillar roadways presents challenges for the safe and efficient retreat of mining panels. Non-penetrating directional pre-splitting alters the roof structure of these roadways and effectively manages their stability under high stress during mining operations. In this study, a three-dimensional experimental model for the non-penetrating pre-splitting of small-coal-pillar roadway roofs was established, the apparent resistivity change in the rock layer during mining of the working face was determined, the propagation law of high-frequency electromagnetic waves in the overlying rock was studied, and the stress distribution law of the surrounding rock was investigated. After non-penetrating pre-splitting in the roof, the apparent resistivity change rate of the overlying rock increased and the electromagnetic waveform exhibited scattering and diffraction, forming a short cantilever beam. After mining, the stress in the adjacent mining panel gateway reduced, resulting in a pressure relief effect on the surrounding rock. These findings were further validated through field application, where the overall deformation of the roadway was reduced by 57%. The research results shed light on the management of roof control in small-coal-pillar roadways and the rational determination of non-penetrating pre-splitting parameters.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.