Abstract

Soil arching has a significant effect on the behaviour of pile-supported geogrid-reinforced embankments due to its complex mechanics. In this study, a three-dimensional finite-element model was established to investigate the development of soil arching during the construction and static loading test on an embankment. The model was verified by comparing the variations in earth pressure on the pile cap with the measured data from well-instrumented full-scale model tests. A good agreement was found between the computed and measured data. The experimental and numerical results consistently showed that the arch foot moves from the edge to the centre of the pile-cap under static loading. Finally, the stress contours are presented to illustrate the development of soil arching during the processes of embankment construction and static loading.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.