Abstract

A series of three-dimensional finite element analyses has been carried out to investigate the effect of the removal of sections of an earth berm supporting an embedded retaining wall. For the particular wall-berm geometry and ground conditions considered in these analyses, relationships between the wall movement, the length of berm section removed, the spacing between successive unsupported sections, and the time elapsed following excavation are presented and discussed. The analyses show that, for a given elapsed time, wall movements are proportional to the length of the excavated berm section provided that the unsupported sections are sufficiently widely spaced. If the spacing between unsupported sections is reduced below some critical value, wall movements then depend on both the length of and distance between the excavated berm sections.Key words: finite element analyses, diaphragm walls, earth berms, construction sequence, three-dimensional effects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.