Abstract
With the increase of distributed energy resources in the distribution grid, planning to ensure sufficient infrastructure and resources becomes critical. Planning at the distribution level is limited by the complexities of optimizing unbalanced systems. In this paper we develop a three-phase infeasibility analysis that identifies weak locations in a distribution network. This optimization is formulated by adding slack current sources at nodes in the system and minimizing their norm subject to distribution power flow constraints. Through this analysis we solve instances of power flow that would otherwise be infeasible and diverge. Under conditions when power flow is feasible, our approach is equivalent to standard three-phase power flow; however, for cases where power flow fails, the nonzero slack injection currents compensate for missing power to make the grid feasible. Since an uncountable number of injected currents can provide feasibility, we further explore the optimization formulation that best fits the solution objective through use of both a least squares and an L1 norm objective. Our L1 norm formulation localizes power deficient locations through its inherent sparsity. We show the efficacy of this approach on realistic unbalanced testcases up to 8500 nodes and for a scenario with a high penetration of electric vehicles.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.