Abstract

This paper is based on the construction project of Wuhan Metro line 6 from Qianjincun Station to Mayinglu Station. In view of the geological condition of overlying sand and underlying limestone, by using FLAC3D5.0 software and considering the fluid–solid coupling effect, the influences of distance between karst cave roof and bedrock surface d, cave diameter D, width w and filling degree ω on the deformation and force of subway tunnel segment after excavation are analyzed. The results show that: (1) The vertical settlements and the axial forces at vault and arch bottom are negatively correlated with d and ω. The axial force at right hance and bending moments at each control point are positively correlated with d and ω. (2) With the increase of D and w, the vertical displacements and axial forces at vault and arch bottom tend to increase. The axial force at right hance and bending moments at each control point have a negative correlation with D and w. (3) Compared with other control points, the axial force and bending moment of arch bottom are the largest and the bending moment of right hance is the smallest. (4) The greater d, the smaller the amplitude of variation of the displacements and internal forces of the segment. The greater D, w and ω, the greater the amplitude of variation of the displacements and internal forces of the segment. The research results can provide guidance for similar engineering.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.