Abstract

– Determination of the ceiling, floor, and the void of the hominid cave.– Using time-depth adjustments to correct floor position.– Statistical method to determine the cave void and real floor depth.– Creation of a 3D representation for the cave.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call