Abstract

In conjunction with a recent proqram to determine and sutstantiate a higher continuous transmission and conversion capacity of the Pacific HVDC Intertie System, a program of scheduled continuous overloadings was implemented. The larqe power converter transformers were considered to te an inteqral component and possible limiting loading factor of the system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.