Abstract

Detail thermodynamic analysis of a combined reheat regenerative steam turbine (ST) based power cycle and water–LiBr vapor absorption refrigeration system (VARS) is presented in this study. The power cycle uses one open and one closed water heater (CWH) for purpose of feed water heating. A parametric analysis is performed to investigate the effects of boiler pressure, fuel flow rate, VARS evaporator cooling load and operating temperatures on performance of the topping power cycle and bottoming VARS. Further a performance comparison of the combined power and cooling plant is made with the power plant (without VARS) to quantify the performance variation due to VARS integration. Comparative performance analysis is also provided for the power plant (without VARS) with and without the CWH in the plant. The analysis indicates that the fuel flow rate and boiler pressure affects only the power cycle performance while the evaporator cooling load and VARS components’ operating temperature has its combined effect both on the power and the cooling system, the evaporator cooling load is the most crucial among them. A sensitive analysis shows that the power and efficiency of the topping cycle change very little with VARS operating temperatures. VARS coefficient of performance is more sensitive to the change in condenser and absorber temperature compared to change in generator and evaporator temperature.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.