Abstract
A thermal storage of 2500 kWh is designed, built and installed at the site of the experimental solar tower of Themis in Targasonne (France) within the POLYPHEM project (H2020 program, Ref N. 764048). The thermal energy storage (TES) consists of a thermocline tank with solid filler and thermal oil as heat transfer fluid. Tank walls, filler bricks and foundations are made of concrete. This new concept introduces some challenges that have been addresed during the construction and commissioning of the TES system. In this paper, authors present the main issues and solutions adopted for the tank design and construction.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.