Abstract

The aqueduct is one of large scale water conservancy project across river, which is the first level of anti-cracking structure with rigorous control of cracks. At present, the thermal analysis of aqueduct structure most borrows ideas from box-girder bridge structure without considering their difference. As the thermal stress of large-scale concrete structure during construction and operational process is redoubtable, the U-shaped model of a practical aqueduct of South-to-North Water Diversion is established to do the steady and transient thermal analyses. The result shows that the structure of U-shaped aqueduct is reasonable, it is not necessary to take special measures to control the temperature during the construction and operational process.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.